Factoria Blvd Stormwater Improvements Project Online Open House

Share on Facebook Share on Twitter Share on Linkedin Email this link

Thank you for your interest in this project. At this time, the Online Open House has concluded. If you have any additional questions or comments, please contact Birol Shaha, bshaha@bellevuewa.gov or 425-452-4477.

What is the project?

Bellevue Utilities is pursuing a project to improve the stormwater system along Factoria Blvd to reduce the risks of street flooding during heavy storm events.

Construction will be located along Factoria Blvd between SE 38th Street and SE 36th Street (see map at right). The project is currently in planning phase, with construction projected to start in Spring 2022.

Thank you for your interest in this project. At this time, the Online Open House has concluded. If you have any additional questions or comments, please contact Birol Shaha, bshaha@bellevuewa.gov or 425-452-4477.

What is the project?

Bellevue Utilities is pursuing a project to improve the stormwater system along Factoria Blvd to reduce the risks of street flooding during heavy storm events.

Construction will be located along Factoria Blvd between SE 38th Street and SE 36th Street (see map at right). The project is currently in planning phase, with construction projected to start in Spring 2022.