ALTERNATIVE C

Alternative C

In this approach, the City would:

  • Construct multiple channels and culverts to replace the current culvert.
  • Relocate the water main to the north and above the new culvert.
  • Potentially replace the existing sewer pipe with a larger pipe.
  • Potentially raise the level of Lake Hills Boulevard and Federal Field Parking Lot.
  • Reconstruct the existing stream channel with two channels within the Lake Hills Greenbelt to provide enhanced fish and wildlife habitat.

Benefits

Anticipated impact

  • Will provide reliability to the water and sewer system and work effectively
  • Increased culvert opening will help reduce surface flooding at the site
  • The multiple culverts and channels will provide enhanced wetland/stream function and increase fish and wildlife habitat
  • Impacts to Lake Hills Boulevard during construction
  • Largest impact is to Lake Hills Greenbelt during construction of the multiple culverts, channel improvements and trail shift
  • Potential impact to Federal Field parking lot during construction
Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>