ALTERNATIVE B

Alternative B

In this approach, the City would:

  • Construct a larger culvert to replace the current culvert, west of the current location.
  • Relocate the water main to the north and above the new culvert.
  • Replace the current sewer pipe with a larger pipe.
  • Re-align the Lake Hills Greenbelt Trail.
  • Slightly raise the level of Lake Hills Boulevard and Federal Field Parking Lot.
  • Realign Kelsey Creek to the west of its current location in the Lake Hills Greenbelt.

Benefits

Anticipated impact

  • Will provide reliability to the water and sewer system and work effectively
  • Increased culvert opening will help reduce surface flooding at the site
  • Provides ability for fish passage and creates moderate additional habitat
  • Moderate impacts to Lake Hills Boulevard
  • Impacts to Lake Hills Greenbelt and Federal Field parking lot during construction
  • Lake Hills Greenbelt Trail will be impacted during construction and alignment will shift


Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>